Search This Supplers Products:Environment testtensile test machinerubber and plastic testingenvironment chamber testtension machineoptical test
publisherN
time2021/07/30
Recently, the China Electric Charging Infrastructure Promotion Alliance released the charging pile operating data for April 2021. As of April 2021, the member units of the alliance have reported a total of 868,000 public charging piles, in April 2021, public charging piles increased by 17,600 units compared with March 2021, and a year-on-year increase of 58.8% in April. If you count the number of private charging piles, as of April 2021, the cumulative number of charging infrastructure (public + private) nationwide is 1.827 million, an increase of 42% year-on-year.
From a geographical point of view, the characteristics of a relatively concentrated public charging infrastructure construction area still exist. Public charging infrastructure in the TOP 10 regions of Guangdong, Shanghai, Beijing, Jiangsu, Zhejiang, Shandong, Anhui, Hubei, Henan, and Hebei accounted for 72.1%. The national charging power is mainly concentrated in Guangdong, Jiangsu, Sichuan, Fujian, Shaanxi, Zhejiang, Shanxi, Henan, Shandong, Beijing and other provinces. The power flow is mainly buses and passenger cars, and other types of vehicles such as sanitation logistics vehicles and taxis. The proportion is relatively small.
For charging pile testing, Huda Technology can provide various test solutions such as constant temperature and humidity test, rain test, etc. Welcome to inquire!
网络文化经营许可证:浙网文[2013]0268-027号|增值电信业务经营许可证:浙B2-20080224-1 2007-2024 Tradevv.com. All rights reserved.